
Featured Case Study
Herne Hill Farm Installaltion
Geoff Wells, Herne Hill Farm manager, uses a full range of energy-saving options on the farm including; solar panels, wind turbines, ground source heating, and voltage optimisation, making his farm highly energy efficient. Voltage consistency saves money, protects equipment, and is easy to install within existing systems. A standby generator ensures 24/7 power for the farm and livestock. The optimiser was supplied via a CEF contractor enquiry, with the contractor noting the strong support and straightforward installation.

12 × IP66 steel enclosures housing control gear for the floodlight system at this Premiership-standard training facility.

Orton House Retirement Home, on The Wirral, has provided assisted caring respite for over 20 years and has recently had it’s boiler house upgraded and the installation is almost complete. Controlling and supplying the heating safely to the whole building, has been given over to MCG’s and Crompton Controls 3000 Series isolators and starters.

Bangor branch in North Wales Group, have recently supplied our new MCG Industrial 3-Phase boards and devices to their customer, Finney’s Benllech, a family run fish and chip shop, who have been in business since 2009.

As part of the recent move into their new building in Boroughbridge, GSPK Circuits are undertaking an extensive 2 year project to completely overall the electrical installation of the premises. GSPK has been supplying the global electronics industry with printed circuits boards for over 50 years. As an integral part of this project, CEF Ripon Branch has been supplying MCG Industrial Enclosures and switchgear.

Geoff Wells, Herne Hill Farm manager, uses a full range of energy-saving options on the farm including; solar panels, wind turbines, ground source heating, and voltage optimisation, making his farm highly energy efficient. Voltage consistency saves money, protects equipment, and is easy to install within existing systems. A standby generator ensures 24/7 power for the farm and livestock. The optimiser was supplied via a CEF contractor enquiry, with the contractor noting the strong support and straightforward installation.

Carabuild Leisure Homes Ltd prides itself on being a trusted family run business. The Company has expanded vastly over recent years and is a proud approved manufacturer of the National Caravan Council. MCG supplied the 4 Way RCD Controlled consumer unit for this project.
Got a case study or referral to share?
If you've completed a project and would like to tell us about your experience, please contact us.